Rike Service, Inc.

 Practical Petroleum Training

 
 

 

 

 

 

Slimhole Drilling

(5 days)

For: Managers and engineers faced with reducing drilling costs.

You learn the key elements of this cost reduction process and how it affects each step in the drilling process, as well as completion character. You discover all the additional technologies necessary to realize the maximum benefit from slimhole wells.

Major Topics Covered:

  • Straight Hole

  • Re-Entry

  • Horizontal

  • Rig Selection

  • Bit Characteristics

  • Downhole Motors

  • Tubulars

  • Pinup Technology

  • Hydraulics

  • Kick Detection

  • Formation Damage

  • Artificial Lift Considerations