Rike Service, Inc. 

 Practical Petroleum Training

 
 

 

 

 

 

Formation Damage Prevention

(5 days)

For: Engineers with normal technical background in fluid mechanics and engineering mathematics

You become the authority on maximum productivity completions without expensive remedial treatments. Every element of each damage mechanism is dug out to disclose where the real culprits lie. You discover how the drilling process can nullify a commercial completion and how to prevent the occurrence. You realize the critical nature of the primary cement job in preventing damage. You follow through to the initial elements of perforating, completion fluids and filtering. You learn how to prevent damage in the critical process of sand control, which is so vulnerable. Best of all, if the damage is there, you learn what to do about it. Never be satisfied with less than an optimum producer ever again.

Major Topics Covered:

  • Concepts of Formation Damage

  • Drilling

  • Primary Cementing

  • Implementing the Job for Less Damage

  • Completion Design

  • Perforating

  • Completion Fluids

  • Gravel Packing

  • Damage Removal (Or Making It Worse?)